Request for Proposal for ABFA Technical Centre Project

Published on: Aug 27, 2018 @ 14:29

Phase 1 – Land Preparations

Works description: This phase will involve pest eradication and controls, heavy
excavation, irrigation system site prep, drainage and water/runoff collection
pond, and further extensive drainage works as part of the site and complete
facilities preparation.
Phase 2 – Parking areas, Entrance, General Electric and Irrigation

Works description: This phase will the preparation of asphalt parking areas,
the main entrance to the facility. Details provided in the Bid document.

Phase 3 – FIELD LIGHTING
Works description: This phase will involve preparing and installing 18
separate aluminum light poles holding a total of 108 separate LED lamps for the
Pitch and practice areas and 14 independent aluminum poles for pathways,
office areas and future dorm buildings.

Phase 4 – VIP Spectator seating, Canopy and Player access tunnels

Works description:Procuring or providing materials and parts to accommodate
VIP spectator seating in the form of polypropylene fold up seats and the
necessary lighting and air circulating equipment for the player access tunnels. A
Sail canopy system is required in order to provide shade and protection from the
elements. The VIP areas run between the Aluminum bleacher spectator seating.
Phase 5 – PATHWAY IRRIGATION SYSTEM AND COMPONENTS

Works description:Vendor/Contractor shall provide costs associated with
procuring materials and/or providing construction services to accomplish the
following:
Procuring and installing – Irrigating all green areas and pathways.
Procuring and providing – all sprinkler and irrigation heads.
Procuring and providing – irrigation smart controller for all zones.
Providing general construction – Water and run-off retention pond.

Phase 6 – OFFICE CENTRE AND HEADQUARTERS

Works description:Procurement and construction of the new ABFA headquarter
office at the ABFA Technical Centre is the focus of phase 6 with the following
interior measurements and outside dimensions in mind. The structure should be
of a modern look and will be constructed on an elevated area to oversee all the
TC soccer pitches.

Published on: Aug 27, 2018 @ 14:29